Detail InformationEdit
San Pedro Municipal Ferry Building may be a former ferry terminal building situated in San Pedro, la, CA that homes the la Maritime deposit. It had been in-built 1941 as a Works Project Administration project. Designed by B. Irvine within the contour modern vogue, the building was a operating ferry terminal from 1941 to 1963. Throughout those years, ferries transported thousands of passengers and vehicles to and from the canneries and military bases on Terminal Island. In 1963, the Vincent Thomas Bridge was completed connecting the land to Terminal Island, and there was now not a desire for ferry service.
Accordingly, the ferry service was terminated. The terminal building on the Terminal Island aspect was destroyed, however the building on the San Pedro aspect was used for several years as associate office block by the la Harbor Department. Because the ferry building began to deteriorate, voters of San Pedro wanted to own it remodeled.
HistoryEdit
N.A.
Must SeeEdit
N.A.
Visiting TimeEdit
N.A.
Closed OnEdit
N.A.
Best Season to VisitEdit
N.A.
Best Time To VisitEdit
N.A.
Time Required for SightseeingEdit
N.A.
Ticket Required :N.A.Edit
Individual National Adult Rs. :N.A.
Kids Rs. :N.A.
Individual Foreigner Adult Rs. :N.A.
Kids Rs. :N.A.
Still Photo Camera Rs. :N.A.
Video Camera Rs. :N.A.
Guide Required :N.A.Edit
Approximate cost: N.A.
Dress Code (If Any) :N.A.Edit
Dress Require:N.A.
Restaurants NearbyAdd / Edit
- N.A.; N.A.; Ph/M – N.A.; Food Serve – N.A.
How to ReachEdit
Taxi :N.A.
Bus :N.A.
Train :N.A.
Air :N.A.
Others :N.A.
Things to CarryEdit
N.A.
Safety / WarningEdit
N.A.
HelplineEdit
N.A.