Roaring Meg hydro scheme

Views:
0

Detail InformationEdit

The Roaring Meg hydro scheme refers to two small hydro electricity power stations fed by the Roaring Meg Dam. The scheme is located next to the Roaring Meg Stream in the Kawarau Gorge, near Cromwell, New Zealand. Roaring Meg is owned and operated by Pioneer Generation. The scheme was built by the Otago Central Power Board starting in 1934 and commissioned 1936, at a cost of 40,000 pounds.. At times the lower station has been flooded by the Kawarau River.
The scheme starts with the 10m high Roaring Meg Dam located 3.6km upstream from the confluence with the Kawarau River. The intake flows into a series of pipes connected to the power stations. The upper station discharges into both a pipe feeding the lower station and the Roaring Meg Stream, while the lower station discharges into the Kawarau River.

HistoryEdit

N.A.

Must SeeEdit

N.A.

Visiting TimeEdit

N.A.

Closed OnEdit

N.A.

Best Season to VisitEdit

N.A.

Best Time To VisitEdit

N.A.

Time Required for SightseeingEdit

N.A.

Ticket Required :N.A.Edit

Individual National Adult Rs. :N.A.

Kids Rs. :N.A.

Individual Foreigner Adult Rs. :N.A.

Kids Rs. :N.A.

Still Photo Camera Rs. :N.A.

Video Camera Rs. :N.A.

Guide Required :N.A.Edit

Approximate cost: N.A.

Dress Code (If Any) :N.A.Edit

Dress Require:N.A.

Restaurants NearbyAdd / Edit

  • N.A.; N.A.; Ph/M – N.A.; Food Serve – N.A.

How to ReachEdit

Taxi :N.A.

BUS :N.A.

Train :N.A.

Air :N.A.

Others :N.A.

Things to CarryEdit

N.A.

Safety / WarningEdit

N.A.

HelplineEdit

N.A.

Gallery