Views:
0
Detail InformationEdit
Challicum Hills Wind Farm is a wind farm encompassed by 35 (1.5 MW) NEG NM 64 wind turbines, with a total generating capacity of 52.5 MW of electricity. The wind farm is near Ararat in western Victoria, Australia. The power station was commissioned in August 2003 and is in a long term PPA with Origin Energy.
HistoryEdit
N.A.
Must SeeEdit
N.A.
Visiting TimeEdit
N.A.
Closed OnEdit
N.A.
Best Season to VisitEdit
N.A.
Best Time To VisitEdit
N.A.
Time Required for SightseeingEdit
N.A.
Ticket Required :N.A.Edit
Individual National Adult Rs. :N.A.
Kids Rs. :N.A.
Individual Foreigner Adult Rs. :N.A.
Kids Rs. :N.A.
Still Photo Camera Rs. :N.A.
Video Camera Rs. :N.A.
Guide Required :N.A.Edit
Approximate cost: N.A.
Dress Code (If Any) :N.A.Edit
Dress Require:N.A.
Restaurants NearbyAdd / Edit
- N.A.; N.A.; Ph/M – N.A.; Food Serve – N.A.
How to ReachEdit
Taxi :N.A.
BUS :N.A.
Train :N.A.
Air :N.A.
Others :N.A.
Things to CarryEdit
N.A.
Safety / WarningEdit
N.A.
HelplineEdit
N.A.
Gallery