Detail InformationEdit
Bajer Bridge is located between the Vrata and Oštrovica interchanges of the A6 motorway in Gorski Kotar, Croatia, spanning Lake Bajer. It is 520 metres (1,710 ft) long. The bridge consists of two parallel structures: The first one was completed in 1995, and the second one in 2008. The bridge is tolled within the A6 motorway ticket system and there are no separate toll plazas associated with use of the bridge. The bridge was constructed by Viadukt.
Traffic is regularly counted and reported by Autocesta Rijeka–Zagreb, operator of the viaduct and the A6 motorway where the structure is located, and published by Hrvatske ceste. Substantial variations between annual (AADT) and summer (ASDT) traffic volumes are attributed to the fact that the bridge carries substantial tourist traffic to the Adriatic resorts. The traffic count is performed using analysis of motorway toll ticket sales.
HistoryEdit
N.A.
Must SeeEdit
N.A.
Visiting TimeEdit
N.A.
Closed OnEdit
N.A.
Best Season to VisitEdit
N.A.
Best Time To VisitEdit
N.A.
Time Required for SightseeingEdit
N.A.
Ticket Required :N.A.Edit
Individual National Adult Rs. :N.A.
Kids Rs. :N.A.
Individual Foreigner Adult Rs. :N.A.
Kids Rs. :N.A.
Still Photo Camera Rs. :N.A.
Video Camera Rs. :N.A.
Guide Required :N.A.Edit
Approximate cost: N.A.
Dress Code (If Any) :N.A.Edit
Dress Require:N.A.
Restaurants NearbyAdd / Edit
- N.A.; N.A.; Ph/M – N.A.; Food Serve – N.A.
How to ReachEdit
Taxi :N.A.
BUS :N.A.
Train :N.A.
Air :N.A.
Others :N.A.
Things to CarryEdit
N.A.
Safety / WarningEdit
N.A.
HelplineEdit
N.A.
Gallery