Detail InformationEdit
The Abwinden-Asten Power Station was built on the Danube in the years 1976 to 1979.
This power plant has nine horizontal shaft Kaplan bulb turbines which are generating clean power from renewable hydropower on the right bank of the Danube. On the left bank you´ll find the weir system.
As a result of the construction of the Abwinden-Asten power plant the harbors of Upper Austria´s capital Linz have become fully navigable even in low water.
Newly created biotopes in the reservoir area provide a habitat for a varied fauna and flora that is best explored within relaxed walks.
HistoryEdit
N.A.
Must SeeEdit
N.A.
Visiting TimeEdit
N.A.
Closed OnEdit
N.A.
Best Season to VisitEdit
N.A.
Best Time To VisitEdit
N.A.
Time Required for SightseeingEdit
N.A.
Ticket Required :N.A.Edit
Individual National Adult Rs. :N.A.
Kids Rs. :N.A.
Individual Foreigner Adult Rs. :N.A.
Kids Rs. :N.A.
Still Photo Camera Rs. :N.A.
Video Camera Rs. :N.A.
Guide Required :N.A.Edit
Approximate cost: N.A.
Dress Code (If Any) :N.A.Edit
Dress Require:N.A.
Restaurants NearbyAdd / Edit
- N.A.; N.A.; Ph/M – N.A.; Food Serve – N.A.
How to ReachEdit
Taxi :N.A.
BUS :N.A.
Train :N.A.
Air :N.A.
Others :N.A.
Things to CarryEdit
N.A.
Safety / WarningEdit
N.A.
HelplineEdit
N.A.
Gallery