Wivenhoe Power Station

Views:
0

Detail InformationEdit

The Wivenhoe Power Station is situated between the Splityard Creek Dam and Lake Wivenhoe. The Splityard Creek dam is situated in hills adjacent to Lake Wivenhoe and is about 100 metres above it. The Wivenhoe Dam has been built across the Brisbane River about 80 kilometres (50 mi) by road from the centre of Brisbane, the capital of the state of Queensland, Australia. The body of water held behind the dam is called Lake Wivenhoe.
During the pumping phase in the operating cycle the generator operates as an electric motor driving the pump to lift water from Lake Wivenhoe to the upper storage of Splityard Creek Dam. When peak demand for electricity occurs the flow of water is reversed, flowing from the upper to the lower storage and driving the turbine generator to generate electricity. The Splityard Creek dam has sufficient capacity for 10 hours of continuous power generation. It takes about 14 hours of pumping to refill it.

HistoryEdit

N.A.

Must SeeEdit

N.A.

Visiting TimeEdit

N.A.

Closed OnEdit

N.A.

Best Season to VisitEdit

N.A.

Best Time To VisitEdit

N.A.

Time Required for SightseeingEdit

N.A.

Ticket Required :N.A.Edit

Individual National Adult Rs. :N.A.

Kids Rs. :N.A.

Individual Foreigner Adult Rs. :N.A.

Kids Rs. :N.A.

Still Photo Camera Rs. :N.A.

Video Camera Rs. :N.A.


Guide Required :N.A.Edit

Approximate cost: N.A.

Dress Code (If Any) :N.A.Edit

Dress Require:N.A.

Restaurants NearbyAdd / Edit

  • N.A.; N.A.; Ph/M – N.A.; Food Serve – N.A.

How to ReachEdit

Taxi :N.A.

BUS :N.A.

Train :N.A.

Air :N.A.

Others :N.A.


Things to CarryEdit

N.A.

Safety / WarningEdit

N.A.

HelplineEdit

N.A.

Gallery